BlonderBeer Type N 10000 l

1,295,440.00

Obtainable productivity of beer:
10.000 liters per day (average);
60.000 liters per week;
3.000.000 liters per year;
quantity of brews per day: 5 brews
(1brew – 1500 l of finished beer);
quantity of brews per week: 40 brews;
quantity of brews per year: 2000 brews / 50 weeks ;

Products: non-filtered beer, filtered beer, pasteurized beer

Category:

MINIBREWERY DELIVERY:
Not included in the cost of the brewery. For transportation of the brewery BlonderBeer. Type N 10000 l is needed 15 trucks with trailer-tent (trailer length: 13.6 m, width: 2.43 m and height: not less than 2.95 m). Company TECHIMPEX can arrange the transportation of the brewery to your company for additional payment on CPT or CIP terms. We will be able to calculate the transportation cost once you will notify the city and country where to deliver the brewery.

OPERATING THE MINIBREWERY:
For operating the brewery BlonderBeer. Type N 10000 l twelve persons are needed:
– five technologists-brewers;
– seven maintenance workers.

INSTALLATION AND LAUNCHING THE MINIBREWERY:
Installation and launching the brewery BlonderBeer. Type N 10000 l is carried by trained team of company TECHIMPEX in 30 calendar days.
NOTE: Installation and launching are included in the price of the brewery.

STAFF TRAINING:
OPTION 1.
Company TECHIMPEX will send its experienced brew master for a period of 21 calendar days to your company after the installation and launching of your minibrewery for thorough training of your brewer to operate and service of the brewery.
NOTE: This option of the training is included in price of the minibrewery.

OPTION 2.
Company TECHIMPEX has a possibility to send its experienced brew master for a period from 2 to 6 months to your minibrewery enterprise, after it is launched, for more in-depth staff training. The cost of this service is 3500 euros per month, return tickets, accommodation and food for the brew master of the company TECHIMPEX.

BRIEF INFORMATION ABOUT THE CONDITIONS OF PAYMENT AND DELIVERY OF THE EQUIPMENT
Conditions of payment:
– 40% – advance payment;
– 60% – after the preparation of the equipment for shipment.
Type of payment: bank transfer.
Terms of delivery: FCA warehouse of TECHIMPEX (can be delivered on terms CPT or CIP Buyer’s warehouse).
Delivery time after receiving an advance payment: 140 calendar days.
Installation time: 30 calendar days.
Warranty: 12 months (under separate arrangement 24-36-48-60 months).
Post-warranty service.

CONSUMPTION OF ELECTRIC POWER BY THE BREWERY EQUIPMENT
OPTION 1. MAIN SOURCE – ELECTRICITY:
– electricity consumption during brewing: 165.8 kWh/brew
work mode: 40 brews per week = 60.000 l of beer per week = 6632 kWh / week;
– electricity consumption during standstill of the brewery: 538-673 kWh / day;
– total electric power needed for brew house of the minibrewery: 250 kW;
– total electric power needed for cooling system of the minibrewery: 150 kW.
OPTION 2. MAIN SOURCE – NATURAL GAS:

Natural gas heating of mash-brew kettle.
– natural gas consumption per one brew: 50 m3
work mode: 40 brews per week = 60.000 l of beer per week = 2000 m3 of natural gas per week;
– electricity consumption during brewing: 2019 kWh / day
– electricity consumption during standstill of the brewery: 538-673 kWh / day;
– total electric power needed for brew house of the minibrewery: 80 kW;
– total electric power needed for cooling system of the minibrewery: 150 kW.

NOTE 1:
Customer can make a list of brewery equipment set by himself, using the information about additional equipment included in the documents sent with the offer.

NOTE 2:
The company TECHIMPEX offers high quality malt, hops and yeast for the business partners in a required amount under one-time, short-term and long-term agreements (information available on request).

Reviews

There are no reviews yet.

Be the first to review “BlonderBeer Type N 10000 l”

Your email address will not be published. Required fields are marked *

Scroll Up
EN
SK EN